Preventive Maintenance 145
2. Unplug the optical fiber.
3. Check the ends of the optical fiber. If necessary, clean the fiber ends.
4. Connect the light source to one end and the power meter to the other end of the
optical fiber.
5. Set the light source and the power meter to the appropriate wavelength:
6. Turn on the light source.
7. Measure the attenuation of the optical fiber.
8. Compare the measured values with below table:
9. Replace the optical fibers with unacceptable attenuation.
Communication test
The communication test is to early detect communication problems by using parameters to
control the POF link power between control Hub and Power Modules.
1. Charge the drive, set below two parameters to
Enable
to have the half power on
Control Hub and PEBB TX POF link.
•
95.55 Control hub half optical power
•
95.70 PM half optical power
2. Observe the following parameters within 30 minutes:
•
70.12/32/52…, Hub RX comm err count A1/A2/A3 …
•
71.12/32/52…, Hub RX comm err count B1/B2/B3 …
•
72.12/32/52…, Hub RX comm err count C1/C2/C3 …
•
70.5/25/45…, PM RX comm err count A1/A2/A3 …
•
71.5/25/45…, PM RX comm err count B1/B2/B3 …
•
72.5/25/45…, PM RX comm err count C1/C2/C3 …
3. The observed RX comm err counters can have an initial value which may different
from 0, but DO NOT have variation.
4. If any counter variation happens during this test, or “Control hub missing PM” fault
occurs, do as following steps:
•
Check/replace the POF link between the Control Hub and PEBB, repeat the
communication test.
•
In case last step doesn’t solve the problem, replace Control Hub daughter board
which connected to the failed communication link, repeat the communication test.
5. Set parameters 95.55 and 95.70 back to
Disable
after this test passed.
Setting
Light source
660 nm, dBm, no modulation
Power meter
630 nm, dBm
Value
Assessment
> -9 dBm
Perfect
> -12 dBm
Acceptable
< -12 dBm
Not acceptable
Summary of Contents for ACS580MV
Page 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Page 4: ......
Page 8: ...8 ...
Page 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Page 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Page 83: ...Standard Commissioning Process 83 ...
Page 96: ...96 Standard Commissioning Process ...
Page 121: ...Option 121 IO signals ...
Page 122: ...122 Option Panel control interface System fault ...
Page 140: ...140 Option ...
Page 148: ...148 Preventive Maintenance ...