Preventive Maintenance 141
5
Preventive Maintenance
Contents of this chapter
This section contains the maintenance schedule with recommended maintenance
intervals and instructions of some special preventive maintenance items, which should be
performed by qualified personnel.
Maintenance schedule
The recommended intervals for maintenance and component replacement are based on
the normal operating conditions of the drive. The drive should be checked at least every
two years by qualified personnel whose recommendations should be followed. Depending
on the actual condition of the drive, the maintenance work can be carried out before or
after the recommended interval.
WARNING
Obey the instruction in
Safety instructions
of
ACS580MV Hardware
Manual
(2UBB004520). If you ignore them, injury or death, or damage to the
equipment can occur.
Legend
Description
I
Inspection (visual inspection and maintenance action if required)
P
Performance of on-site work (commissioning, tests, measurements or other work)
R
Preventive replacement
Summary of Contents for ACS580MV
Page 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Page 4: ......
Page 8: ...8 ...
Page 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Page 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Page 83: ...Standard Commissioning Process 83 ...
Page 96: ...96 Standard Commissioning Process ...
Page 121: ...Option 121 IO signals ...
Page 122: ...122 Option Panel control interface System fault ...
Page 140: ...140 Option ...
Page 148: ...148 Preventive Maintenance ...