Standard Commissioning Process 49
Note:
If the error information like below, please create a folder named temp in drive C
.
•
Waiting nearly 5 minutes, programming successfully finished.
Press any key to exit.
•
Turn off the control power.
•
Remove the XILINX platform cable USB II.
•
Restore all daughter boards on control hub.