34 Standard Commissioning Process
3. Inform customer send remote MCB close/open CMD, and measure voltage as below
table. The values should not be higher than 5V.
Remote MB CMD drawing
Other checking items
Before energizing the Auxiliary supply for the first time, proceed as follows:
1. Make sure that all auxiliary switches, optional circuit breakers and protection switches
inside the drive have been switched off.
2. Before turning on the fuses and breakers, measure the incoming auxiliary voltage and
control voltage, verifying that it is /- 10% of the rated value.
Probe+
Probe-
AC
DC
X1:42
PE
< 5V
< 5V
X1:44
PE
< 5V
< 5V
X1:46
PE
< 5V
< 5V
X1:48
PE
< 5V
< 5V
X1:50
PE
< 5V
< 5V
X1:52
PE
< 5V
< 5V
Summary of Contents for ACS580MV
Page 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Page 4: ......
Page 8: ...8 ...
Page 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Page 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Page 83: ...Standard Commissioning Process 83 ...
Page 96: ...96 Standard Commissioning Process ...
Page 121: ...Option 121 IO signals ...
Page 122: ...122 Option Panel control interface System fault ...
Page 140: ...140 Option ...
Page 148: ...148 Preventive Maintenance ...