Option 103
Check of the contactors operation
•
Check the switch S7804 can’t be operated when it is locked at any of three status
(Local, Stop and Remote).
•
Local, stop and remote mode have interlocked function. Check these functions with
special contactor operations as below table, and all the test result shall be ‘X’.
Note:
‘X’ means the switches status don not change after operating.
•
KM1(Q1), KM2(Q2) and KM3(Q3) are designed to interlock electrically. Check these
functions with some operation sequences as below table, and the test result shall be
same as listed in the below table.
Note:
1. ‘X’ means the switches status don not change after operating.
2. ‘
√
’ means the switches status shall be changed after operating.
Contactors
operation
Local mode
stop mode
remote mode
Remote
operation
Local
operation
Remote
operation
Local
operation
KM1(Q1)_close
X
X
X
X
KM1(Q1)_open
X
X
X
X
KM2(Q2)_close
X
X
X
X
KM2(Q2)_open
X
X
X
X
KM3(Q3)_close
X
X
X
X
KM3(Q3)_open
X
X
X
X
Contactors status
S7804: Local status
Contactors operate:
Local
S7804: Remote status
Contactors operate:
Remote
KM1(Q1) open
KM2(Q2) open
KM3(Q3) close
close KM1(Q1) ( X )
close KM2(Q2) ( X )
open KM3(Q3) (
√
)
close KM1(Q1) ( X )
close KM2(Q2) ( X )
open KM3(Q3) (
√
)
KM1(Q1) open
KM2(Q2) open
KM3(Q3) open
close KM1(Q1) (
√
)
close KM2(Q2) ( X )
close KM3(Q3) (
√
)
close KM1(Q1) (
√
)
close KM2(Q2) ( X )
close KM3(Q3) (
√
)
KM1(Q1) close
KM2(Q2) open
KM3(Q3) open
open KM1(Q1) (
√
)
close KM2(Q2) (
√
)
close KM3(Q3) ( X )
open KM1(Q1) (
√
)
close KM2(Q2) (
√
)
close KM3(Q3) ( X )
KM1(Q1) close
KM2(Q2) close
KM3(Q3) open
open KM1(Q1) ( X )
open KM2(Q2) (
√
)
close KM3(Q3) ( X )
open KM1(Q1) ( X )
open KM2(Q2) (
√
)
close KM3(Q3) ( X )
Summary of Contents for ACS580MV
Page 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Page 4: ......
Page 8: ...8 ...
Page 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Page 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Page 83: ...Standard Commissioning Process 83 ...
Page 96: ...96 Standard Commissioning Process ...
Page 121: ...Option 121 IO signals ...
Page 122: ...122 Option Panel control interface System fault ...
Page 140: ...140 Option ...
Page 148: ...148 Preventive Maintenance ...