Start-up checklist
61211-1270302
MMZ M
6-17
Start-up checklist
Switching the CMM on
–
Has the CMM been switched on in the correct order?
➤
–
Power supply connected?
–
Control cabinet switched on?
–
Ram protection activated?
–
Drives switched on?
–
Operating mode selected?
–
Computer switched on?
–
Measuring software started?
–
Light barrier activated?
➤
Mounting the probe
–
Has the probe been secured on the ram with a screw? Torque: 2,2
Nm.
➤
Stylus system assembly
–
Have the criteria for the assembly been observed?
See operating instructions »Sensors«.
–
Have the limit values for the stylus system been observed?
See operating instructions »Sensors«.
Clamping the workpiece
–
Is the workpiece in the correct position?
➤
–
Is it possible to measure all workpiece dimensions in one cycle?
–
Is measurement possible without collision? A collision with the
changer rack, for example.
–
Has the workpiece been clamped properly?
Содержание MMZ M
Страница 18: ...Warranty 1 6 61211 1270302 MMZ M ...
Страница 65: ...4 61211 1270302 MMZ M 4 1 Technical data This chapter contains CMM 4 2 Technical data ...
Страница 74: ...Installation 5 6 61211 1270302 MMZ M ...
Страница 92: ...Start up checklist 6 18 61211 1270302 MMZ M ...
Страница 118: ...Terminating the measuring operation 7 26 61211 1270302 MMZ M ...
Страница 146: ...2Glossary 2 61211 1270302 MMZ M ...
Страница 152: ...6Alphabetic index 6 61211 1270302 MMZ M ...
Страница 153: ......
Страница 154: ...MMZ M Operating Instructions 2021 10 05 61211 1270302 ...