Protective Elements
Commissioning: f< and DF/DT – Underfrequency and DF/DT
Object to be tested:
All frequency protection stages that are projected as f< and Df/Dt.
Necessary means:
Three-phase voltage source and
Frequency generator that can generate and measure a defined frequency change.
Procedure:
Testing the threshold values
Feed nominal voltage and nominal frequency to the device:
Decrease the frequency below the f< threshold and
Apply a defined frequency change (step change) that is above the setting value (example: apply a frequency
change of 1 Hz during the set time interval DT if the setting value DF is 0.8 Hz). The relay has to trip
immediately.
Successful test result
Permissible deviations/tolerances and dropout ratios can be taken from the Technical Data.
Commissioning: f> and DF/DT – Overfrequency and DF/DT
Object to be tested:
All frequency protection stages that are projected as f> and Df/Dt.
Necessary means:
Three-phase voltage source and.
Frequency generator that can generate and measure a defined frequency change.
Procedure:
Testing the threshold values
Feed nominal voltage and nominal frequency to the device:
Increase the frequency above the f> threshold and
Apply a defined frequency change (step change) that is above the setting value (example: apply a frequency
change of 1 Hz during the set time interval DT if the setting value DF is 0.8 Hz). The relay has to trip
immediately.
Successful test result:
Permissible deviations/tolerances and dropout ratios can be taken from the Technical Data.
423
MRU4
DOK-HB-MRU4-2E
Содержание High PROTEC MRU4
Страница 1: ...Manual Voltage Relay MRU4 Software Version 3 0 b DOK HB MRU4 2E Revision B English...
Страница 51: ...Installation and Connection Ethernet RJ45 Terminals 51 MRU4 DOK HB MRU4 2E 1 8 TxD TxD RxD n c n c RxD n c n c...
Страница 64: ...Navigation Operation Navigation Operation 64 MRU4 DOK HB MRU4 2E 1 2 3 5 7 6 8 10 9...