Protective Elements
Commissioning: delta phi - Vector Surge
Object to be tested:
All frequency protection stages that are projected as delta phi (vector surge).
Necessary means:
Three-phase voltage source that can generate a definite step (sudden change) of the voltage pointers
(phase shift).
Procedure:
Testing the threshold values
Apply a vector surge (sudden change) that is 1.5 times the setting value (example: if the setting value is 10°
apply 15°).
Successful test result:
Permissible deviations/tolerances and dropout ratio can be taken from the Technical Data.
424
MRU4
DOK-HB-MRU4-2E
Содержание High PROTEC MRU4
Страница 1: ...Manual Voltage Relay MRU4 Software Version 3 0 b DOK HB MRU4 2E Revision B English...
Страница 51: ...Installation and Connection Ethernet RJ45 Terminals 51 MRU4 DOK HB MRU4 2E 1 8 TxD TxD RxD n c n c RxD n c n c...
Страница 64: ...Navigation Operation Navigation Operation 64 MRU4 DOK HB MRU4 2E 1 2 3 5 7 6 8 10 9...