Protective Elements
Commissioning: df/dt - Rate of Change of Frequency
Object to be tested
All frequency protection stages that are projected as df/dt.
Necessary means
Three-phase voltage source and
Frequency generator that can generate and measure a linear, defined rate of change of frequency.
Procedure
Testing the threshold values
Keep on increasing the rate of change of frequency until the respective element is activated.
Note the value.
Testing the trip delay
Set the test voltage to nominal frequency.
Now apply a step change (sudden change) that is 1.5 times the setting value (example: apply 3 Hz per
second if the setting value is 2 Hz per second) and
Measure the tripping time at the relay output. Compare the measured tripping time to the configured tripping
time.
Successful test result:
Permissible deviations/tolerances and dropout ratios can be taken from the Technical Data.
421
MRU4
DOK-HB-MRU4-2E
Содержание High PROTEC MRU4
Страница 1: ...Manual Voltage Relay MRU4 Software Version 3 0 b DOK HB MRU4 2E Revision B English...
Страница 51: ...Installation and Connection Ethernet RJ45 Terminals 51 MRU4 DOK HB MRU4 2E 1 8 TxD TxD RxD n c n c RxD n c n c...
Страница 64: ...Navigation Operation Navigation Operation 64 MRU4 DOK HB MRU4 2E 1 2 3 5 7 6 8 10 9...