Protective Elements
Commissioning: Residual Voltage Protection - Measured [59N]
Object to be tested
Residual voltage protection stages.
Necessary components
1-phase AC voltage source
Timer for measuring of the tripping time
Voltmeter
Procedure
(for each element)
Testing the threshold values
For testing the threshold
and fallback values, the test vol
tage at the measuring input for the residual voltage has to
be increased until the relay is activated. When comparing the displayed values with those of the voltmeter, the devi-
ation must be within the permissible tolerances.
Testing the trip delay
For testing the trip delay a timer is to be connected to the contact of the associated trip relay.
The timer is started when the limiting value of the tripping voltage is exceeded and it is stopped when the relay trips.
Testing the fallback ratio
Reduce the measuring quantity to less than 97% of the trip value. The relay must only fall back at 97% of the trip
value at the latestly.
Successful test result
The measured threshold values, trip delays and fallback ratios comply with those specified in the adjustment list.
Permissible deviations/tolerances can be taken from the Technical Data.
398
MRU4
DOK-HB-MRU4-2E
Содержание High PROTEC MRU4
Страница 1: ...Manual Voltage Relay MRU4 Software Version 3 0 b DOK HB MRU4 2E Revision B English...
Страница 51: ...Installation and Connection Ethernet RJ45 Terminals 51 MRU4 DOK HB MRU4 2E 1 8 TxD TxD RxD n c n c RxD n c n c...
Страница 64: ...Navigation Operation Navigation Operation 64 MRU4 DOK HB MRU4 2E 1 2 3 5 7 6 8 10 9...