Left Rear Heat Sink Component
8-20
Force EZ-C Series Service Manual
Replace the Left Rear Heat Sink Components
Figure 8-4.
Left rear heat sink components
•
To replace the HVPS (high voltage power supply) resistor, remove the screw
and washer that secure it to the heat sink. Position the new HVPS resistor on
the heat sink and reinstall the washer and screw.
•
To replace one or more of the four HVPS FETs, remove the screw and washer
that secure the FET to the heat sink. Position the new FET on the heat sink
and reinstall the washer and screw.
•
To replace the bridge rectifier, note the orientation of the four wires. Then,
detach them from the bridge rectifier.
Remove the screw that secures the bridge rectifier to the heat sink. Position
the new bridge rectifier on the heat sink and reinstall the screw.
Connect the four wires to the appropriate locations on the bridge rectifier.
Black
Red
Brown
Blue
HVPS FETs
HVPS resistor
Bridge rectifier
Содержание Force EZ - C Series
Страница 1: ...Service Manual Valleylab Force EZ C Series Electrosurgical Generator with Instant Response Technology...
Страница 6: ...vi Force EZ C Series Service Manual...
Страница 20: ...1 6 Force EZ C Service Manual...
Страница 64: ...4 30 Force EZ C Series Service Manual...
Страница 156: ...7 26 Force EZ C Series Service Manual...
Страница 158: ...Interconnect Diagram 8 2 Force EZ C Series Service Manual Interconnect Diagram Figure 8 1 Electric cable connections...
Страница 208: ...10 18 Force EZ C Series Service Manual...