7
© 2013-2017 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO2006/2306/2506/2007/2307/2507/2303A/2303AM/2803AM/2309A/2809A
PREVENTIVE MAINTENANCE (PM)
7 - 25
7.4.9
Automatic duplexing unit
Fig. 7-21
Items to check
Cleaning Lubrication
Replacement
(x 1,000 sheets)
Operation
check
Parts list
<P-I>
Remarks
K1
Transport roller (upper
and lower)
A
R
1-7
1-8
K2
One side of the GCB
busing to which the
shaft is inserted
L
1-3
K3
One side of the plastic
busing to which the
shaft is inserted
W1
K4
Paper guide
B
1-16
K2
K2
K4
K1
K3
Содержание E-STUDIO2006
Страница 14: ......
Страница 729: ......
Страница 730: ...1 11 1 OSAKI SHINAGAWA KU TOKYO 141 8562 JAPAN ...