II-19
II-2. Operation
This chapter provides information necessary for system operation, including layout of the operating
unit, startup and shutdown procedures, screen navigation, and operating instructions.
WARNING
1. Do not make the inner panel open when the equipment is working. High voltage parts causing electrical
shock are inside.
2. Do not take off a protective earth cable connecting front cover and enclosure.
3. Do not take off a protective earth cable connenting panel cover and enclosure.
CAUTION
Do not make the panal cover take off when the equipment is working.
Note
Measurement operation continues during data setting (MENU/INPUT) and check (MENU/CHECK)
procedures.
Measurement values during operation may change when settings are changed.
II-2-1. Main operating (electronics) unit layout
Unfasten the right side clasp of the unit enclosure and open the cover to the left.
The layout of major components is as shown below.
Fig. 2-2-1; Case Interior
(may differ according to specification)
LCD
RS232C connector
Power switch
Operating Keys
Contrast adjustment
Fuse holder
Panel Cover
Содержание UFL-30
Страница 1: ...Doc No KF08 001J Ultrasonic Flowmeter UFL 30 Installation Operation Manual ...
Страница 11: ... 10 blank ...
Страница 12: ...I Installation ...
Страница 60: ...II Operation ...
Страница 109: ...II 50 blank ...
Страница 110: ...III Other ...
Страница 123: ...III 14 III 2 5 Dimensions Main Unit ...
Страница 128: ...III 19 blank ...
Страница 129: ...III 20 blank ...
Страница 145: ...III 36 blank ...
Страница 165: ...III 56 blank ...