Step 3; Core part treatment
1. Measure 3mm from shield return point.
2. Make slit at the point where 3mm from folding
back shields checked on above.
NOTE: Do not damage core part by over slitting.
Please remain sheath thickness as
around 0.1mm at least.
3. Twisting core sheath for let slit larger.
4. W
ring off the core sheath slowly.
5. Confirm 3mm core cable as left as below.
6. Cut core cable left as 10mm.
7. Completed.
Note; When you would like to soldering
treatment as additional, we recommend
to do it only at the tip. Otherwise core
might break at the base.
3mm
10mm
3mm
I- 38
Содержание UFL-30
Страница 1: ...Doc No KF08 001J Ultrasonic Flowmeter UFL 30 Installation Operation Manual ...
Страница 11: ... 10 blank ...
Страница 12: ...I Installation ...
Страница 60: ...II Operation ...
Страница 109: ...II 50 blank ...
Страница 110: ...III Other ...
Страница 123: ...III 14 III 2 5 Dimensions Main Unit ...
Страница 128: ...III 19 blank ...
Страница 129: ...III 20 blank ...
Страница 145: ...III 36 blank ...
Страница 165: ...III 56 blank ...