I-16
dd. Hold down the GND part of the coaxial cable by the cable clamp and tighten up the screw firmly.
After that, tighten up the screw of the terminal "TB10" without so strong.
Note that this turn of work is important. When the wrong order, work to clamp GND maybe give
a stress to the core conductor of the cable and cut it.
ee. The "DOWN" sensor coaxial cable is similarly processed from aa to dd.
ff. Close the terminal cover.
gg. Finally, tighten the cable gland exactly to fix the cable and to protect against water and dust.
(Torque : Approx. 1.5 N m)
1st
2nd
Содержание UFL-30
Страница 1: ...Doc No KF08 001J Ultrasonic Flowmeter UFL 30 Installation Operation Manual ...
Страница 11: ... 10 blank ...
Страница 12: ...I Installation ...
Страница 60: ...II Operation ...
Страница 109: ...II 50 blank ...
Страница 110: ...III Other ...
Страница 123: ...III 14 III 2 5 Dimensions Main Unit ...
Страница 128: ...III 19 blank ...
Страница 129: ...III 20 blank ...
Страница 145: ...III 36 blank ...
Страница 165: ...III 56 blank ...