![Thermo Finnigan LCQ Deca XP Plus Скачать руководство пользователя страница 47](http://html.mh-extra.com/html/thermo-finnigan/lcq-deca-xp-plus/lcq-deca-xp-plus_hardware-manual_1104316047.webp)
__________________ LCQ Deca XP Plus Hardware Manual __________________
2-1
Chapter 2
Changing API Probe Assemblies
You need to change the API probe assembly (ESI, APCI, or NSI) of the API
source when you switch between ESI, APCI, and NSI ionization techniques.
NSI is covered separately in the LCQ Series Nanospray Ion Source
Operator’s Manual.
The ESI probe assembly consists of the ESI flange and probe. The APCI
probe assembly consists of the APCI flange, probe, and corona discharge
needle assembly. You do not need to shut down or vent the system to change
the API probe assembly. The topics in this chapter are as follows:
•
Removing the APCI probe assembly
•
Installing the ESI probe assembly
•
Removing the ESI probe assembly
•
Installing the APCI probe assembly
Содержание LCQ Deca XP Plus
Страница 1: ...LCQ Deca XP Plus Hardware Manual Revision A 97344 97003 TM ...
Страница 46: ......
Страница 56: ......
Страница 70: ......
Страница 114: ...INSERT Figure5_2 ps 11 X 17 Z fold Figure 5 2 Mass analyzer and ion optics ...
Страница 172: ......
Страница 194: ......
Страница 216: ......