![Thermo Finnigan LCQ Deca XP Plus Скачать руководство пользователя страница 161](http://html.mh-extra.com/html/thermo-finnigan/lcq-deca-xp-plus/lcq-deca-xp-plus_hardware-manual_1104316161.webp)
Service Maintenance
______________________________________ Replacing PCBs and Assemblies in the Tower
__________________ LCQ Deca XP Plus Hardware Manual _________________
5-55
8. Carefully lift the System Control PCB out and away from the MS
detector. Disconnect the high speed serial cable and 8 kV power supply
cables if you have not already done so.
9. Unpack the new System Control PCB (P/N 97044-61010). Retain the
packing materials so that you can pack and ship the defective PCB to the
Thermo Finnigan Repair Center in San Jose. Be sure to note the
apparent problem or symptoms on the enclosed forms.
10. Position the new System Control PCB in the space occupied by the old
PCB.
11. With a Phillips screwdriver, tighten the three screws and the eight
fasteners that hold the System Control PCB to the MS detector chassis.
12. Reconnect all cables to the System Control PCB. The following cables
are connected to the System Control PCB:
•
Ion gauge / Convectron gauge (P9)
•
Front panel (P2)
•
Analyzer (J3)
•
Spray shield (J6)
•
RF and waveform amplifiers (P12)
•
Analyzer Aux. (P5)
•
Electron multiplier / conversion dynode power supplies (P3)
•
RF control (P8)
•
LC I/O (P4)
•
Switching power supplies (J2)
•
APCI heater (J4)
•
Transformer (XMFR) (P1)
•
High speed serial (P6 backside of PCB)
•
8 kV power supply (J5 backside of PCB)
13. Reinstall the protective cover over the System Control PCB, as follows:
a.
Insert the protective cover into the guide slots on the MS detector
chassis and push the cover down until it is seated.
b. With Phillips screwdriver, tighten the five screws that hold the
protective cover to the MS detector chassis.
14. Reinstall the right side cover of the MS detector, as follows:
a.
Place the cover against the right side of the MS detector such that the
studs on the cover insert into the guide slots on the System Control
PCB protective cover.
Содержание LCQ Deca XP Plus
Страница 1: ...LCQ Deca XP Plus Hardware Manual Revision A 97344 97003 TM ...
Страница 46: ......
Страница 56: ......
Страница 70: ......
Страница 114: ...INSERT Figure5_2 ps 11 X 17 Z fold Figure 5 2 Mass analyzer and ion optics ...
Страница 172: ......
Страница 194: ......
Страница 216: ......