Z- 11
WZ02-6702E
Electric Parts Location Diagram (Upper)
Z- 11
Z- 11
IWZ02-6320E07b
73
73
1
343-636-63000
4. Pressure switch installation diagram
4.1 Fix jib
Isometric drawing
b
Main winch hoisting down detection switch
a
Main winch hoisting up detection switch
e
Boom extending detection switch
f
Boom retracting detection switch
CN535
CN534
CN546
CN532
h
g
Boom lowering detection switch
Boom raising detection switch
CN536
CN537
Left detection
ON
ON
OFF
j
Right detection
OFF
ON
ON
i
Slewing
Lowering detection
OFF
ON
ON
h
Raising detection
ON
ON
OFF
g
Elevation
Retracting detection
ON
ON
OFF
f
Extending detection
OFF
ON
ON
e
Telescoping
Hoisting down detection
OFF
ON
ON
d
Hoisting up detection
ON
ON
OFF
c
Aux. winch
Hoisting down detection
OFF
ON
ON
b
Hoisting up detection
ON
ON
OFF
a
Main winch
Push
Neutral
Pull
Note
Lever operation
Switch name
ON-OFF indicates energization condition of contact point.
Switch operating list
Di9+
Di10+
Di11+
Di12+
Di13+
Di14+
Di15+
Di16+
Di17+
Di18+
d
c
Aux. winch hoisting down detection switch
Aux. winch hoisting up detection switch
CN533
CN547
j
i
Slewing right detection switch
Slewing left detection switch
CN541
CN540
A
D
View C
View D
View B
C
B
View A
Содержание GR-1600XL
Страница 1: ......
Страница 8: ...7 WA04 5330E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 28: ...14 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...
Страница 30: ...16 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...
Страница 33: ...19 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...