Y-6
Y-6
Assembly Adjustment (Crane Operation)
58
WY05-4112E
2.4 Shim adjustment at the side of the boom
bottom (inner box)
(Section [4])
(1) The clearance between the slide plate and the
outer box shall be adjusted at the entrance of the
outer box.
(2) The clearance shall be as minimum clearance.
(3)
Apply a thread locking agent (ThreeBond 1401
or the equivalent) to the bolt. Lightly tighten the
bolt, and then loosen it 1/4 turns.
(4) Refer to Table 3 about the amount of shim.
(Table 3)
Standard number of shims
(each side)
TELE.1
0.6-mm shim: 1,
1-mm shim: 1
TELE.2
0.6-mm shim: 1,
1-mm shim: 2
TELE.3
0.6-mm shim: 1,
1-mm shim: 1
TELE.4
0.6-mm shim: 1,
1-mm shim: 1
TELE.5
0.6-mm shim: 1,
1-mm shim: 1
Содержание GR-1600XL
Страница 1: ......
Страница 8: ...7 WA04 5330E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 28: ...14 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...
Страница 30: ...16 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...
Страница 33: ...19 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...