Y-6
Y-6
Assembly Adjustment (Crane Operation)
53
WY05-4112E
Y-6 Assembly Adjustment
(Crane Operation)
1. Boom head adjustment
1.1 Upper part of boom head
The dimension Z should be 1.5 mm (0.06 in) or
less by choice of suitable spacers. Apply a thread
locking agent (ThreeBond 1305 or the equivalent)
to the bolt.
At first the bolt should be tightened. Then the nut
should be tightened.
1.2 Lower part of boom head
The bolt should be touched softly to the surface Y.
Then, tighten the nut.
Apply a thread locking agent (ThreeBond 1305 or
the equivalent) to the threaded section.
The dimension X should be 1.5 mm (0.06 in) or
less by choice of suitable spacers. Apply a thread
locking agent (ThreeBond 1305 or the equivalent)
to the bolt.
At first the bolt should be tightened. Then the nut
should be tightened.
△
2
342-022-70000
Содержание GR-1600XL
Страница 1: ......
Страница 8: ...7 WA04 5330E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 28: ...14 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...
Страница 30: ...16 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...
Страница 33: ...19 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...