Y-6
Y-6
Assembly Adjustment (Crane Operation)
56
WY05-4112E
2.2 Shim adjustment at the lower part of the
boom bottom (inner box)
(Section [2])
(1) Insert the shims in accordance with Table 1. Then
inner box shall be inserted to the outer box until
the slide plates are covered with the outer box.
(2) Check no interference between the slide plates
and the retainer in the outer box.
(3) Apply a thread locking agent (ThreeBond 1401 or
the equivalent) to the bolt. Lightly tighten the bolt,
and then loosen it 1/4 turns.
(Table 1)
Standard number of shims
TELE.1
1-mm shim: 2
TELE.2
1-mm shim: 2
TELE.3
1-mm shim: 2
TELE.4
1-mm shim: 1
TELE.5
No shim adjustment
Содержание GR-1600XL
Страница 1: ......
Страница 8: ...7 WA04 5330E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Страница 28: ...14 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...
Страница 30: ...16 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...
Страница 33: ...19 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...