Complete the following checklist to ensure that the safety requirements are met for
the data center in which the server will be installed.
Related Information
■
“Electrical Power Requirements” on page 8
■
Sun Server X4-2 Safety and Compliance Guide
Can the customer provide a single PDU and
its circuits to support the power
requirements in case on PDU fails?
Can the customer ensure power loads are
evenly distributed across all circuits of a
single PDU?
Can the customer provide appropriate
power drops for the PDUs?
TABLE:
Safety Checklist
Safety Checklist Considerations
Yes
No
N/A
Comment
Is there an emergency power shut off?
Is there a fire protection system in the data
center room?
Is the computer room adequately equipped
to extinguish a fire?
Is antistatic flooring installed?
Is the floor below the raised floor free of
obstacles and blockage?
TABLE:
Rackmount Checklist
Rackmount Considerations
Yes
No
N/A
Comment
Содержание Server X4-2
Страница 1: ...Sun Server X4 2 Installation Guide Part No E38019 04 February 2014...
Страница 10: ...x Sun Server X4 2 Installation Guide February 2014...
Страница 14: ...xiv Sun Server X4 2 Installation Guide February 2014...
Страница 18: ...4 Sun Server X4 2 Installation Guide February 2014...
Страница 44: ...30 Sun Server X4 2 Installation Guide February 2014...
Страница 122: ...108 Sun Server X4 2 Installation Guide February 2014...
Страница 160: ...146 Sun Server X4 2 Installation Guide February 2014 4 Click Virtual Drives The Virtual Drives screen appears...
Страница 162: ...148 Sun Server X4 2 Installation Guide February 2014...
Страница 172: ...158 Sun Server X4 2 Installation Guide February 2014...
Страница 206: ...192 Sun Server X4 2 Installation Guide February 2014...