52
Sun Server X4-2 Installation Guide • February 2014
FIGURE:
Sliding the Server Into the Rack
Caution –
Verify that the server is securely mounted in the rack and that the
slide-rail locks are engaged with the mounting brackets before you install the
optional cable management arm.
Related Information
■
“Install the First-Generation Cable Management Arm” on page 68
■
“Install the Second-Generation Cable Management Arm” on page 52
■
“Verify Operation of Slide-Rails and CMA” on page 73
▼
Install the Second-Generation Cable
Management Arm
Follow this procedure to install the second-generation cable management arm
(CMA), which you can use to manage cables connected to the rear of the server.
1. Unpack the CMA.
The following figure shows the second-generation CMA components.
Содержание Server X4-2
Страница 1: ...Sun Server X4 2 Installation Guide Part No E38019 04 February 2014...
Страница 10: ...x Sun Server X4 2 Installation Guide February 2014...
Страница 14: ...xiv Sun Server X4 2 Installation Guide February 2014...
Страница 18: ...4 Sun Server X4 2 Installation Guide February 2014...
Страница 44: ...30 Sun Server X4 2 Installation Guide February 2014...
Страница 122: ...108 Sun Server X4 2 Installation Guide February 2014...
Страница 160: ...146 Sun Server X4 2 Installation Guide February 2014 4 Click Virtual Drives The Virtual Drives screen appears...
Страница 162: ...148 Sun Server X4 2 Installation Guide February 2014...
Страница 172: ...158 Sun Server X4 2 Installation Guide February 2014...
Страница 206: ...192 Sun Server X4 2 Installation Guide February 2014...