Emergency control system
(Emergency Lowering)
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
7-9
Note
First retract all the telescopes completely.
Rotate boom back into its centre position. If necessary
please lift the boom before carrying out the rotation.
Afterward lower the boom.
Should the safety cut-out be annulled through the execution of above-
mentioned movements, it is possible to take the Steiger into normal opera-
tion after having found out for which reason a safety cut-out took place. If it
is not possible to find out the reason or if faults are discovered, the opera-
tion must be stopped immediately. After having eliminated these faults, the
Steiger can be taken into operation once again.
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...