6
Operation
6-4
RUTHMANN-Steiger
®
TB270
BA.GB.12-27409-05-07-FTA-jr
maintenance instructions of the vehi-
cle’s manufacturer.
Clutch pedal
released
release.
Pilot lamp „Power
take-
off“
shines
see operating instructions of the
chassis-manufacturer.
Engine revolution
automatically pre-regulated.
Switching-off:
Component
Position/Indication
Execution in driver’s cab
Clutch pedal
depressed
completely depress.
Power take-off
OFF
switch off in acc. with the operating
instructions
of
the
chassis-
manufacturer.
Clutch pedal
released
release.
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...