6
Operation
6-2
RUTHMANN-Steiger
®
TB270
BA.GB.12-27409-05-07-FTA-jr
6.2
Travelling operation
Attention!
In order to avoid a damage of the Ruthmann-Steiger dur-
ing the journey, the transport of material and goods in
the working cage is forbidden (exception: shunting
movements)!
Note
Please also see chapter 1.2.
Pre-condition:
Putting the Ruthmann-Steiger into operation acc. to chapter 5.
Ruthmann-Steiger in
transport position
.
Component
Position/Indication
Execution in driver’s cab
Vehicle engine
Start
Start in accordance with the operat-
ing instructions of the chassis-
manufacturer
The operation of the driving is to be done in accordance with the operating
instructions of the chassis-manufacturer.
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...