9
Maintenance
9-26
RUTHMANN-Steiger
®
TB270
BA.GB.12-27409-05-07-FTA-jr
9.4
Inspection and Maintenance
Before substantial inspection and repair works are started the Ruthmann-
Steiger must be cleaned. All defects found during the inspection have to be
eliminated immediately.
9.4.1
Inspection List / Maintenance List
Explanations concerning the intervals:
d
=
daily or per working shift
300 h
=
after 300 operating hours
600 h
=
after 600 operating hours
a
=
annually
=
Inspection work
W
=
Maintenance work
S
=
Test by an expert
Inspection List / Maintenance List
Interval
Remark,
Component
Work to be carried out
d
300
h
600
h
a
other inter-
vals
Generally
Lighting
Check for function and cleanness
Clean
W,
if necessary
Oper. materi-
als
Check fuel reserve
Complete
vehicle
visually for damage (fissures,
deformations, corrosion)
Check painting (scratches, crack-
offs)
Visual and function test of safety
devices
Ruthmann-Steiger
Ruthmann-
Steiger
Regular inspection acc. to
BGR 500 - 2.10
S
complete
Visual check
Clean
W
W,
if necessary
Check inscription for complete-
ness and legibility
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...