5
Taking into operation
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
5-1
5
Taking into operation
Attention!
If faults are determined when putting it into operation,
operation must not be started. Operation may only start
after elimination of the faults.
Note
Apart from the following explanations especially the safety
instructions in chapter 1.2 must be observed.
The Ruthmann-Steiger must be checked for roadworthiness and operating
safety each time before it is put into operation.
5.1
Definition of transport and basic position
Transport and basic position are identical.
Position of the components
Component
Position
Stabilizing jacks Jack
front
left
retracted
Jack
front
right
retracted
Jack
rear
left
retracted
Jack
rear
right
retracted
Boom
Turret
centre position
Boom system
in boom rest
Telescope
retracted
Working cage
Door
closed
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...