Index
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
III
3.3.17
Operating panel of Emergency Control .................................. 3-16
3.3.17.1 Change-over language ........................................................... 3-16
3.4
Fuses
3-17
3.4.1
Fuses carrier chassis ............................................................. 3-17
3.4.2
Fuses Ruthmann-Steiger ....................................................... 3-17
4
Operating elements and displays
4-1
4.1
Arrangement of Emergency Cut-off Push buttons
4-1
4.2
Operating elements and displays of the chassis
4-2
4.3
Operating elements and displays of the Ruthmann-
Steiger
4-2
4.3.1
Operating elements and indications on the instrument
panel in the driver’s cab ........................................................... 4-2
4.3.2
Control panel at switch box on working cage ........................... 4-3
4.3.3
Switch box (emergency control) at Steiger-substructure .......... 4-7
4.3.3.1
Operating Panel „Emergency Control“ ..................................... 4-8
4.3.3.2
Touch panel of Emergency Control .......................................... 4-9
4.3.3.3
Operational and informative messages of the plain text
indication ................................................................................ 4-12
4.3.4
Superordinate Emergency Control System ............................ 4-18
4.3.4.1
Hand pump ............................................................................ 4-18
4.3.5
Emergency control system in extreme cases ......................... 4-19
4.3.5.1
Ball cock ................................................................................ 4-20
4.3.5.2
Solenoid arresting device ....................................................... 4-20
4.3.5.3
Way valves / Solenoid valves ................................................. 4-21
4.3.5.3.1 Way valves for extension and retraction of the jacks and for
rotation of boom ..................................................................... 4-22
4.3.5.3.2 Way valves for control of boom and of working cage ............. 4-23
5
Taking into operation
5-1
5.1
Definition of transport and basic position
5-1
5.2
Measurements before starting a journey
5-3
5.3
Measurements to be taken before operating of
Ruthmann-Steiger
5-4
5.3.1
Location ................................................................................... 5-5
5.3.1.1
Securing within public road traffic ............................................. 5-5
5.3.1.2
Subsoil of stabilizing jacks ....................................................... 5-7
5.3.2
Earthing (Optional extra) .......................................................... 5-9
5.4
Preventive measurements for winter operation
5-10
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...