
5
Taking into operation
5-6
RUTHMANN-Steiger
®
TB270
BA.GB.12-27409-05-07-FTA-jr
Traffic sign (building site)
Traffic installations, as e.g.:
Warning lights,
Road closing devices, as e.g.
Barriers,
leading/warning bars),
leading cones l,
mobile closing panel (with or without warning flag)
mobile closing panel with blinking arrow (with or with-
out warning flag).
Safety guards
The securing of working sites and the use of road closing devices is effect-
ed in accordance with the German regulations for the securing of work
sites at roads (RSA).
Attention!
If the boom and/or the working cage is lowered under
4,5 m above ground within the traffic area of road vehi-
cles - with working cage rotated to the side -also the
area underneath the working cage must be secured.
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...