5
Taking into operation
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
5-3
5.2
Measurements before starting a journey
The Operating Instructions of the chassis manufacturer must be observed.
Additional checks before starting the engine:
visually for damage (fissures, deformations, corrosion at carrying
parts, fastening and locking of removable connections, leakages
etc.)
Ruthmann-Steiger in
transport position,
Additional checks after switching on the ignition:
The Pilot lamps „Steiger not in transport position“ and „Stabilizing
jacks not in basic position“ on the electrical control panel of the in-
strument panel has to have extinguished.
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...