9
Maintenance
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
9-43
(W
A1
; W
A2
or W
A3
) for the rope stressing device must continue to
run perpendicular to the two ropes. The nuts have to rest com-
pletely on their bearing surfaces and must at no events be tilted.
When re-stretching the extension ropes also the corresponding re-
traction chains will be stretched. You have to take care that the re-
traction chains will not be overloaded. The position of the rocker
(W
E1
; W
E2
or W
E3
) for the corresponding chain stressing device
must continue to run perpendicular to the two chain strands. The
nuts of the adjustment screws (E
1.1, 1.2
; E
2.1, 2.2
or E
3.1, 3.2
) have to
rest completely on their bearing surfaces and must at no events
be tilted.
Due to necessary knowledge of such work we recommend to let have
the re-spanning of the chains and ropes carried out by the Ruth-
mann-after-sales-service.
Check prestressing of the retraction chains and extension ropes after
a running-in period. Extend and retract telescope several times and
check functionality. A small distance between the boom heads must
remain in retracted position.
We recommend to exchange the extension ropes after 10 years at the
latest. Only original Ruthmann-replacement extension chains may be
used.
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...