9
Maintenance
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
9-27
Interval
Remark,
Component
Work to be carried out
d
300
h
600
h
a
other inter-
vals
Check free spaces for movement
sequences of mech. and hydr.
constr. components
Check free spaces for movement
sequences of power track
Check power tracks for fastening
and damage
Check fastening of removable
connections for firm hold
Check superstructures for fas-
tening and damage
Check covering of roof of driver’s
cab (optional extra) for fastening
and damage
,
firstly after three
months
Bearing points
and bolt locks
(Ruthmann-
Check bearing points with plastic
bushes and screw fittings of bolt
locks
,
firstly after
300 h
Steiger
complete)
Check other bearing points as well
as bolt locks and its screw fittings
Bearing points with DU-bushes
clean and grease or cover dividing
points / contact surfaces with oil
W
if grease nipple
provided grease
bearing point
Bearing points Visual check
with plastic
bushes
Cleaning
W
W,
if necessary
Jacking
Check well-running
Check tear at guiding device
Clean and grease gliding surfaces
of jack arms
W
W,
if necessary
Ground contact interrogation:
Grease the screw pressure spring,
bolt and the oblong hole bearing
W
W,
if necessary
Guiding device jack cylinder:
Clean and grease the area of the
guide rings
W
W,
if necessary
Jack plate
Grease hinged presser foot
W
W,
if necessary
after cleaning of
the Steiger
Turret
Visual check
Check baffles and guiding devices
of the chains for power track for
wear
Boom
Check well-running
Check tear at guiding devices
Grease telescope gliding surfaces
W
W,
if necessary
after cleaning of
the Steiger
Check prestressing of retraction
chains and extension ropes
Check ropes for surface corrosion
and damages
Check wear at the rope groove of
the rope roller
Grease extension ropes
W,
if necessary
Check chains for surface corrosion
and link corrosion
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...