6
Operation
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
6-37
6.6.3
Boom movement
Remarks, instructions and pre-
conditions of chapter „Operating the Steiger“
must be observed.
„Boom up“ or „Boom down“
Component
Movement /
Indication
Execution
Boom (lifting arm)
lifting
Actuate push button „boom up“.
or
Boom (lifting arm)
lowering
Actuate push button „boom down“.
Boom „rotation left“ or „rotation right“
Component
Movement /
Indication
Execution
Boom (Turret)
rotation left
Actuate push button „Rotation left“.
or
Boom (Turret)
rotation right
Actuate push button „Rotation right“.
„Telescope out“ or „Telescope in“
Component
Movement /
Indication
Execution
Telescope
extension
Actuate push button „Telescope out“.
or
Telescope
retraction
Actuate push button „Telescope in“.
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...