3
Description of the
Ruthmann-Steiger
3-8
RUTHMANN-Steiger
®
TB270
BA.GB.12-27409-05-07-FTA-jr
3.3.3
The Steiger's movements
Boom up / down (Raise / Lower )
Movements that put the working
cage at a greater or lower eleva-
tion. The boom (lifting arm)
moves around horizontal „B“ ax-
is.
Rotation left / right
Movement of the boom (turret)
around the vertical „C“ axis.
Telescope out / in (Telescope
extended / retracted)
Extension or retraction of the
boom system (lifting arm).
Rotate cage left / right
Movement of the working cage
around the vertical „D“ axis.
In case of danger, electrical triggering of the Steiger's movements can be
disconnected by actuating an EMERGENCY CUT-OFF switch.
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...