6
Operation
6-36
RUTHMANN-Steiger
®
TB270
BA.GB.12-27409-05-07-FTA-jr
Individual control of the vertical stabilizing jacks
Component
Movement /
Indication
Execution
Jacks left and/or
Jacks right
vertically
extension
Depress
push button „Jack vertical
down“ as well as also actuate push
button „Jack front left“,
and/or
Depress push button „Jack vertical
down“ as well as also actuate push
button „Jack rear left“,
and/or
Depress push button „Jack vertical
down“ as well as also actuate push
button „Jack front right“,
and/or
Depress push button „Jack vertical
down“ as well as also actuate push
button „Jack rear right“.
Check
inclination
of the Steiger!
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...