1
Applications and Safety
Instructions
1-12
RUTHMANN-Steiger
®
TB270
BA.GB.12-27409-05-07-FTA-jr
over 220 kV up to
380 kV
5,0 m
with unknown nominal voltage
5,0 m
*
1
Depending on the different countries maybe other safety distances
(protection distances) may apply. The operating staff must ask about
the corresponding local regulations for safety distances.
You must not go below the prescribed safety distances with all Steiger
movement. They apply in all directions against direct touching also to
machines, tools and material. Influences from outside, e.g. possible os-
cillating motions of the working cage or overhead lines in case of wind
must be observed when calculating the safety distances.
If you have no information about possible parts being under voltage, you
have to keep the maximum safety distance at all events.
Even with materials which are less conductive a flashover can occur in
case of wetness.
1.2.11
Earthing of Aerial Platforms when being used at transmitting
stations, wind power stations or transformer stations
When working on or nearby e.g. transmitting stations or wind power sta-
tions or transformer stations the regulations of the operating authority of
the plant must be observed.
Before commencing work on or nearby e.g. transmitting stations or wind
power stations or transformer stations the Ruthmann-Steiger must
properly be connected to the ground if necessary.
If no regulations for the earthing of the Ruthmann-Steiger are known,
the earthing measurements must always be discussed with the operator
of the plant before starting work.
1.2.12
Use of Aerial Platforms in residential and/or sensitive areas
The operating hours of hydraulic aerial platforms are regulated by the
local regulations of the country (e.g. „Machines and Noise protection
Regulation“). Residential and/or sensitive areas are e.g.:
Residential areas, small housing estates,
Health resorts and areas nearby hospitals,
Areas around hospitals and nursing stations,
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...