4
Operating elements and
displays
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
4-23
1.
Proportional valve
Speed regulation
(not to be controlled manually)
1.
Proportional valve
Speed regulation
(not to be controlled manually)
1.
Proportional valve
Speed regulation
(not to be controlled manually)
4.3.5.3.2
Way valves for control of boom and of working cage
The following solenoid valves are situated at turret:
No.
Manual override
left
right
Function
1.
/
Inclination levelling of working cage down or
up.
1.
/
Boom (lifting arm) lowering and lifting.
1.
/
Telescope in or out.
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...