General indications concerning the permissible surface pressures:
unpaved grounds approx. 25 - 35 N/cm
2
paved ground
approx. 50 - 60 N/cm
2
road topping
approx. 75 - 100 N/cm
2
On soft or unpaved ground or if the permissible surface pressure is
exceeded, the jack plates must be increased by suitable supporting
plates.
It must be ensured that the vehicle cannot slip off. Subsoil and
supporting plates must be undamaged and free of ice, oil, grease and other
greasy stuffs.
When the conditions of the ground change, e.g. due to rain or thaw, the
stability of the Ruthmann-Steiger can be reduced also during operation.
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...