6
Operation
6-24
RUTHMANN-Steiger
®
TB270
BA.GB.12-27409-05-07-FTA-jr
Note
In order to avoid dangers and to give the machine a longer
life, the telescope should be retracted firstly if possible when
bringing the boom back into its basic position and afterwards
rotate the boom to the centre / longitudinal axle of the Stei-
ger. Then the boom has to be lowered into its rest.
6.5.4.1
„Boom up“ or „Boom down“
Component
Movement /
Indication
Execution at operating panel
Boom (lifting arm)
lifting
left joystick
„Boom up“
or
Boom (lifting arm)
lowering
left joystick
„Boom down“
Содержание 27409
Страница 4: ......
Страница 12: ......
Страница 20: ......
Страница 62: ......
Страница 104: ......
Страница 162: ......
Страница 186: ......
Страница 193: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 7 9 1 3 Lubricating point plan ...
Страница 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Страница 246: ......
Страница 252: ......
Страница 254: ......
Страница 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Страница 256: ......
Страница 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Страница 260: ......
Страница 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...