background image

Important:

 You will need the M4000-PRO’s unique MAC Address and Challenge Key (provided on the 2 labels 

attached to the cover of the Quick Start Guide which is included in the M4000-PRO packaging). One label is 
permanently adhered to the Quick Start Guide and the other is removable for your convenience. 

1                                  2                                 3

WIRING FAULT

UNSAFE VOLTAGE

BlueBOLT

M4000-PRO

ENABLED

Power Management with Control System Interactive Functionality.

• 15 Amp Capacity M4000-PRO   
  
• 7 Rear Panel Outlets and One Front Panel Convenience Outlet in 3 Controlable banks

• Fully Programmable

• BlueBOLT

®  

Enabled

 

• Linear Filtration with 3 Isolated LiFT Filter Banks, -18.7dB@10kHz, -50.5dB@100kHz,  -43.9@1MHz 

• Rear Panel Circuit Breaker

• Removable Front Rack Ears

• 12 Volt Input Triggering

• Detachable 8 ft. Power Cord

• AVM & Protect-or-Disconnect Circuitry

M4000-PRO Instructions

10002793-A    1/27/15

B LT

Blue

Содержание M4000-PRO

Страница 1: ...VOLTAGE BlueBOLT M4000 PRO ENABLED Power Management with Control System Interactive Functionality 15 Amp Capacity M4000 PRO 7 Rear Panel Outlets and One Front Panel Convenience Outlet in 3 Controlabl...

Страница 2: ...Instructions Front Panel Features Overview pg 2 Rear Panel Features Overview Bubble of Protection pg 3 BlueBOLT Setup Registration Trouble Shooting pg 4 OutletSequencingandM4000 PROSpecifications pg 5...

Страница 3: ...oduct circuit break ers The M4000 PRO is designed to eliminate these transients by providing a start up delay for the Bank 3 outlets and a shut down delay for the other Outlet Banks This minimizes inr...

Страница 4: ...in or moisture does not operate normally or has been dropped 12 Where the power cord is used as the main disconnect device the discon nect device shall remain readily accessible 13 This device must be...

Страница 5: ...at 5e RJ 45 8P8C 10 100 1000BASE T compatible PoE compat ible 8 DC Trigger input 3 5mm mono jack 5 24VDC tip ring When a phone plug is connected to the DC trigger applied voltage on the trigger input...

Страница 6: ...one DSL line from the M4000 PRO back to modem router s input Step 4 Connect Ethernet cablefrom router modem to BlueBOLT input on M4000 PRO Step 5 Plug in M4000 PRO SYSTEM SETUP 2 Network Equipment NOT...

Страница 7: ...n the DC trigger input going from 0V to 5 24VDC or by the sequence com mand received on the Ethernet port When the M4000 PRO is powered up recovering from an over voltage shutoff or recovering from an...

Страница 8: ..._______ __________________________________________ __________________________________________ __________________________________________ __________________________________________ ____________________...

Страница 9: ...rnum 12345678 sernum fwver 1 0 1 fwver info device The following sections document the possible message content and it should be assumed that the contents are always enclosed by the envelope and that...

Страница 10: ...Core Brands use only Query sendsettings Response settings Time stamp of the data provided in UNIX time time timestamp delay id bank Delay for outlet bank bank act action Action 0 turn off delay 1 turn...

Страница 11: ...Outlet Bank Command an outlet bank to turn OFF wait for its power cycle delay time and then turn back ON Command cycleoutlet Power cycle an outlet bank Attribute id bank Which outlet bank to control C...

Страница 12: ...Outlet Bank Delays Command set delay Set delay settings for an outlet bank Attribute id bank Set delay settings for an outlet bank act 0 1 2 Action 0 OFF delay 1 ON delay 2 Power cycle delay Content d...

Страница 13: ...DDR PORT eventmgr commands General Event Element Structure All event messages are contained within an event element which will contain a timestamp attribute time and an event ID attribute evtid The ti...

Страница 14: ...2 delay Outlet bank 1 power cycle delay 12 sec triggerena id 1 triggerena Outlet bank 1 trigger enabled brightness 2 brightness Brightness level 2 out of 5 max set Settings Changed A Settings Changed...

Страница 15: ...ction Fired event is posted when the M4000 PRO performs a scheduled operation 13 The day element contains the daysofweek value for the days of the week the action is scheduled to fire This element is...

Страница 16: ...nto an outlet on a circuit different from that to which the receiver is connected 4 Consult the dealer or an experienced radio TV technician for help Any special accessories needed for compliance must...

Отзывы: