15-52
Control Communication - Field Busses and Protocols
Rexroth IndraDrive FCS01.1
DOK-INDRV*--FCS01*****-IB01_EN-P
When the converter has switched to
Ready for activation
state, it will
transmit the following response telegram:
Byte no.
0
1
2
3
4
5
6
7
8
9
10
11
12
13
Significance
STX
LG
ADR
PID
PID
IND
IND
PV
PV
STW
STW
AV1
AV1
BCC
hexadecimal
02
0C
00
00
00
00
00
00
00
0B
31
00
00
34
Fig. 15-69: Example: Status word
Bit
Value
Value
HEX
Significance
15
0
Parameter record bit 1 off
14
0
Parameter record bit 0 off
13
0
reserved
12
0
0
Counterclockwise rotation off
11
1
Clockwise rotation on
10
0
Value has fallen below comparison value
9
1
Bus control
STW
Byte
No. 09
8
1
B
Setpoint value = actual value
7
0
No warning
6
0
No activation disable
5
1
No quick-stop
4
1
3
Voltage enable
3
0
Free of failure
2
0
Disable operation
1
0
Not ready for operation
STW
Byte
No. 10:
0
1
1
Ready for activation
Fig. 15-70: Example: Status word
Note:
The control telegram must be transmitted cyclically as it
cannot be guaranteed that the converter goes to the desired
state within the response time of a telegram.
Enable with 50% setpoint value
A frequency converter with the USIP address 10 which is in "Ready for
activation" state is to be enabled with 50% setpoint value in clockwise
rotation. The control has received a last response telegram as follows.
Procedure:
•
Check status word (STW 0B 31)
•
Set address (address 0A)
•
Generate control word (STW 04 7F)
•
Generate setpoint (2000 hex)
•
Transmit
telegram
•
Check response telegram (STW 0F 37)
Содержание IndraDrive Fc FCS01
Страница 28: ...5 2 Delivery Rexroth IndraDrive FCS01 1 DOK INDRV FCS01 IB01_EN P ...
Страница 34: ...6 6 Certifications and Types Rexroth IndraDrive FCS01 1 DOK INDRV FCS01 IB01_EN P ...
Страница 56: ...8 20 Installation Rexroth IndraDrive FCS01 1 DOK INDRV FCS01 IB01_EN P ...
Страница 88: ...10 4 Commissioning Rexroth IndraDrive FCS01 1 DOK INDRV FCS01 IB01_EN P ...
Страница 237: ......