GB 02908 - Edition 02 - November 07
1/1
E 15
Shipping procedure
Located on the upper cover, this label warns the user against possible
risks of injury due to any hand contact with hot surfaces. It states that
protective gloves should be used before performing any intervention.
The protective gloves should be used in accordance to the protective
gloves supplier’s instruction.
A 329 982 - 2 and A 215 138 - 2
Preparing the pump
for shipping
Drain the pump
Water must be drained to avoid hoses freezing up during shipment.
Draining of the water cooling circuit
E 12
Seal the inlet and exhaust
Pump must be sealed hermeticaly to avoid leak of by products and
residual gases.
Blank-off flange kit
F 10
Blank the inlet
Place the centering ring equipped with O-ring on the inlet port.
Place the equipped inlet blank-off flange.
Secure it with the quick connect clamp.
A103P
A603P / A1003P
Inlet connection
DN50 ISO-K
DN100 ISO-K
Blank the exhaust
Place the centering ring equipped with O-ring on the exhaust port.
Place the outlet blank-off flange.
Secure it with the quick connect clamp.
A103P / A603P / A1003P
Exhaust connection
DN25 ISO-KF
Study the preliminary precautions
E 11
.
adixen Vacuum Products - Operating instructions - A3P Series