60
Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
7. Continue in this manner for each connector until you reach the right side of the
fabric card.
8. Repeat
through
for all line cards to be installed.
9. Inspect the CXP connectors.
See
“Inspect the Line Card CXP Connectors for Installation” on page 60
Related Information
■
“Inspect the Fabric Card XBOW Connectors for Installation” on page 54
■
“Inspect the Pins on the Front Side of the Midplane” on page 50
■
“Suggested Tools for Installation” on page 19
▼
Inspect the Line Card CXP Connectors for Installation
The small CXP connectors on the line card are for the InfiniBand cables. These
connectors are much simpler and more robust than XBOW connectors, so inspection
is much easier.
1. Identify the prerequisite and subsequent tasks you must perform in
conjunction with this procedure, to install the switch.
See the table in
“Installation Sequence” on page 20
.
2. Check the small connectors for any debris, or cracked or bent fittings.
Most debris can be blown out. If you find a cracked or bent connector, contact
your Sun Service representative.
3. Inspect the InfiniBand cables.
See
“Inspecting the InfiniBand Cables for Installation” on page 61
Related Information
■
“Inspect the InfiniBand Cable Connectors for Installation” on page 63
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...