Installing the Switch
27
8. Remove the internal saddle.
9. Lift off the switch bag.
10. Make a visual check to ensure that the switch chassis is undamaged.
11. Move the switch to the operating location using a computer lifting device.
12. Unsecure the switch chassis from the shipping pallet.
See
“Unsecure the Chassis From the Pallet” on page 28
Related Information
■
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...