112
Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
d. Slowly move the connector in.
As you slide the connector in, the top of the shell should scrape against the
underside of the top of the CXP receptacle.
■
If the cable stops or binds after about 5 mm (1/4 in.) travel, back out and
repeat from
■
If the connector stops or binds with about 2 mm (1/8 in.) still to go, back out
and repeat
.
e. Continue to push the connector in until the hooks catch onto the top of the
receptacle.
5. Curve the cable to the right through the branches of the cable tree.