84
Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
5. Verify the parameters have been properly set:
6. Save the parameters and boot the CMC:
7. Consider your next step:
■
(Optional) Configure the network management port to enable switch
management over the Ethernet network.
See
“Access the CMC From the Network Management Port” on page 84
■
Verify the CMC status.
See
“Verify the CMC Status” on page 86
Related Information
■
“Access the CMC From the Serial Management Port” on page 82
▼
Access the CMC From the Network Management Port
To access the CMC using the Ethernet network, you must first configure the network
management port through the serial management port. See
the Serial Management Port” on page 82
. You must also have set the initial
uboot
parameters. See
“Set the Initial UBoot Parameters” on page 83
You can set network parameters according to the specific details of your network
configuration using the
clia setlanconfig
command.
Note –
The following procedure makes changes that do not require a reset or reboot.
1. Identify the prerequisite and subsequent tasks you must perform in
conjunction with this procedure, to install the switch.
See the table in
“Installation Sequence” on page 20
.
2. Set the IP address for the CMC:
where
IP_address
is in the form of
xxx.xxx.xxx.xxx
.
shmm1500
printenv
shmm1500
saveenv
shmm1500
boot
#
clia setlanconfig 1 3
IP_address
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...