Installing the Switch
105
3. Check for line card power faults:
If an installed line card is shown to
FAIL
, investigate why.
4. Check line card internal voltages:
If an installed line card is shown to
FAIL
, investigate why.
5. Verify that the switch chips in the line cards are operational:
If an installed line card is shown as
not boot correct
, investigate why.
6. Retrieve each line card’s firmware versions:
where
slot
is the slot number for the installed line cards. For example:
7. Repeat
and record the information for each line card and compare to
identify any discrepancies.
All line cards should have the same firmware versions.
8. Consider your next step:
■
(Optional) Display and record the line cards FRU ID information.
See
“Identify the Line Card Addresses” on page 106
.
■
Connect the Infiniband cables.
See
“Attach Cables to the CXP Connectors” on page 109
Related Information
■
Switch Command Reference
,
showpresent
command
#
checkpwrfault | grep LC
#
checkvoltages
#
checkswitches | grep LC
# getfwversion lc
slot
#
getfwversion lc 0
FW versions for LC 0
H8 version : 0.1.1
LC FPGA version : 1.0.1
I4 FW image version : 7.2.00
#
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...