68
Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
Caution –
Installing the fabric card is a methodical task and cannot be rushed. To
prevent damage to the fabric card or the midplane XBOW connectors, pay close
attention to the procedure and work slowly.
1. Identify the prerequisite and subsequent tasks you must perform in
conjunction with this procedure, to install the switch.
See the table in
“Installation Sequence” on page 20
.
2. Lift the fabric card from the work surface and orient it vertically, with the wide
rail at the top and the narrow rail at the bottom.
3. Insert the fabric card into the chassis at the vacant slot.
Ensure that the fabric card is vertical.
Note –
Once the fabric card is about halfway into the slot, it is no longer necessary
to bear the weight of the fabric card.
4. Continue to slide the fabric card in, maintaining a vertical orientation.
When you feel resistance, stop.
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...