44
Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
12. Install the 10 smaller M4 screws on the front of the switch chassis to secure the
switch to the cable trees.
Note –
The screws secure to the outer surface of the switch chassis flange.
13. Install the four M6 screws at the rear of the switch chassis to secure the switch
to the rails.
14. Retract the cabinet stabilization mechanism (as required).
15. Inspect the switch components before installing them.
See
“Inspecting the Components” on page 45
Related Information
■
“Physical Specifications” on page 2
■
“Suggested Tools for Installation” on page 19
■
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...